Bangladesh

Dhaka

A South Asian megacity humming with rickshaws. The metro, open since 2022, is changing how the city moves.

Metro

The fastest and most comfortable way around Dhaka. Ride with a single-journey ticket or an MRT/Rapid Pass (10% discount). Note that Friday service starts in the afternoon.

Updated on July 15, 2026

How to ride

  1. 1
    Buy a ticket
    Buy a single-journey ticket from a machine or counter (distance-based). If you ride often, an MRT/Rapid Pass gives a discount.
  2. 2
    Pass the security check
    There is a baggage check at the station entrance. Large luggage may take extra time.
  3. 3
    Tap in at the gate
    Tap your ticket or pass on the gate reader.
  4. 4
    Check the direction and board
    Northbound trains head to Uttara North, southbound to Motijheel. Check the platform signs. No eating or drinking on board.
  5. 5
    Tap out at your destination
    Insert your single-journey ticket into the exit gate (it is collected). Tap out with your pass.

Fares

Single fares2

Single journey
Distance-based (BDT 5 per km). The maximum applies to the full Uttara North-Motijheel run.
20〜100 BDT ≈ $0.2–0.8
With MRT / Rapid Pass
10% off the single-journey fare. The pass is a rechargeable IC card.
18〜90 BDT ≈ $0.1–0.7

Estimates use exchange rates as of September 5, 2026

Payment

Tap to ride Unverified
The operator does not name the brands it accepts
IC card
MRT/Rapid Pass, sold at station counters
Cash
For single-journey tickets

Quick facts

Hours
7:10–22:00
Frequency
About every 10 min
Fares from
20 BDT+

Heads-up

  • Lose the single-journey ticket and you cannot exit

    You need your single-journey ticket to exit. If you lose it, you cannot pass the gate and may be charged a penalty fare.

  • No trains on Friday mornings until the afternoon

    No service on Friday mornings (trains start around 15:00). Expect heavy crowds during morning and evening rush hours.

  • A women-only coach runs; an extension is being built

    A women-only coach is available. The extension to Kamalapur is under construction (planned for 2026).

Timetable

Operating hours 7:10–22:00
Typical duration Uttara North to Motijheel (full line, 16 stations) in about 35-40 minutes
Check the official site for the latest times and service status Official site

Route map

16 stations